Our Lady Of The Assumption R C Church and Assumption Priory, Victoria Park Square, London, E2 9PB
Observations to Other Authorities
What is being proposed?
Observation requested by Diocese of Westminster Churches Committee for the existing boiler equipment is approximately 15 years old. Only 25% of the boilers are currently working, parts are obsolete and no longer available. The boilers provide heating for the Church and it is imperative that the building is heated sufficiently to protect the historic fabric. New smaller boilers, valves, pressurisation unit and finned tube heaters are required to redesign the system. It is expected that efficiency of the system will be 30-40% more efficient and will improve the comfort of the parishioners. It will lower heating costs and environmental impact in line with the Churches Net Zero targets. Limited works are required externally i.e. removing the existing flues in an interior courtyard and replacing with new black powder coated flues. There is limited loss of historic fabric of the Church as a result of the proposals.
Description from the source record.- Application type
- Observations to Other Authorities
- Status in this record
- No objection raised
- Council decision
- No Objection (Observations Applications)
The application so far
- Application date
9 July 2026
- Decision recorded
29 July 2026
No Objection (Observations Applications)
Validation dates, consultation deadlines and target decision dates are shown on the council register where published.
Where is the proposal?
Use the council’s site plan to confirm the application boundary.
View this address on a map →Documents, comments & decisions
Open the official application to look for submitted plans, supporting documents, consultation details and the decision notice. Availability varies by application.
Open official council record ↗Source: PlanIt / local planning authorities. The council register is the formal source for the latest position.
