Aveland Court Aveland Road Torquay TQ1 3PT
Tree works
What is being proposed?
Consent was granted under application reference AT/2023/0123; however, the approved tree works were not undertaken. A new application is therefore being submitted. T1 ? Lime: Pollard to the specified height to manage the risk associated with extensive decay and hollowing within the lower stem. Mallet sounding indicates that the hollow extends approximately 750 mm above the uppermost visible cavity. T2 ? Western red cedar: Fell to ground level due to its poor physiological and structural condition following historically inappropriate and excessively severe pruning. The previous pruning does not accord with current good arboricultural practice as set out in BS 3998:2010 and has left the tree with limited potential for satisfactory long-term retention. The tree has limited visibility from public vantage points, and its removal would therefore have little effect on the area's wider visual amenity. T3 ? Oak: Reduce the crown to suitable growth points near the former pollard points, retaining adequate live growth wherever practicable. The work is required to reduce crown dimensions and associated mechanical loading because the tree occupies a confined position immediately adjacent to a boundary wall. The crown is markedly asymmetrical due to suppression and shading from taller neighbouring trees.
Description from the source record.- Application type
- Tree works
- Status in this record
- Awaiting decision
No decision is recorded in this copy. Check the council register to confirm the current stage and whether comments are still open.
The application so far
- Application date
7 September 2026
- Decision date
No decision date supplied
Validation dates, consultation deadlines and target decision dates are shown on the council register where published.
Where is the proposal?
Use the council’s site plan to confirm the application boundary.
View this address on a map →Documents, comments & decisions
Open the official application to look for submitted plans, supporting documents, consultation details and the decision notice. Availability varies by application.
Open official council record ↗Source: PlanIt / local planning authorities. The council register is the formal source for the latest position.
