Fitzroy Court, 57-59 Shepherds Hill, Hornsey, London, N6 5RD
Tree works
What is being proposed?
(T1) Oak Reduce the height and overall crown spread by approximately 2–3 metres, with selective crown rebalancing to restore a more even and balanced structure. A large limb has previously failed from the tree, causing significant damage to the garages below and leaving the remaining crown noticeably unbalanced. The proposed reduction will help to restore balance, reduce excessive end weight and assist in maintaining the tree’s long-term health and structural stability. There is also a large limb extending over the new garages which contains a significant cavity. Due to its position directly above the garage roofs, it is recommended that this limb is removed back to the main trunk to eliminate the immediate risk of further limb failure and potential damage to the buildings below. Remove major deadwood throughout the crown where appropriate to reduce the risk of falling branches and improve overall safety.
Description from the source record.- Application type
- Tree works
- Status in this record
- Awaiting decision
No decision is recorded in this copy. Check the council register to confirm the current stage and whether comments are still open.
The application so far
- Application date
2 September 2026
- Decision date
No decision date supplied
Validation dates, consultation deadlines and target decision dates are shown on the council register where published.
Where is the proposal?
Use the council’s site plan to confirm the application boundary.
View this address on a map →Documents, comments & decisions
Open the official application to look for submitted plans, supporting documents, consultation details and the decision notice. Availability varies by application.
Open official council record ↗Source: PlanIt / local planning authorities. The council register is the formal source for the latest position.