See applications in the area below, alongside planning rules and protections at your chosen location.
Within 0.62 miles of BT60 4DJApplication dates: 16 Sep 2025 to 16 Sep 2026Showing applications within 0.62 miles of this postcode.
5stored matches · incomplete0Types of mapped rules or protections found here, such as conservation areas, listed buildings or flood-risk zones. We count each type once, separately from applications. A zero means none were returned by our data sources; other restrictions may still apply.
SEARCH APPLICATIONS
Narrow your search
Search the selected area by proposal, reference, status, type, authority or date.
5 matching stored records. Coverage is incomplete; this is not a complete application count.
Stored planning records. The planning source could not be checked just now. Showing matching records already saved; newer applications or decisions may be missing. Your area and filters have not been changed.
Amendment to an existing permissionAwaiting decision
Addition of a first floor bedroom space over the ground floor sun lounge. Removal of window to first floor landing to accommodate the additional bedroom.
Reference
LA08/2026/0925/NMC
Application date
25 Aug 2026
PlanIt / local planning authorities · Collected 16 Sep 2026 03:27 UTC
Non material change to application LA08/2018/1268/F - amendments to external finishes for rear and side elevations of sites 03,04,05,06,07,08,09,10,11,12,14,15,16 &17
Retention of a compound for the storage and sales of vehicles along with the retention of 3 No buildings and all associated siteworks including fences, gates and LED lights on timber poles with proposed hedge and tree planting.
Discharge of condition 07 of LA08/2018/1268/F which reads: No works shall take place between 1 March and 31 August inclusive, unless a competent ecologist has undertaken a detailed check for active bird's nests immediately before works commence and provided written confirmation that no nests are present/birds will be harmed and there are appropriate measures in place to protect nesting birds. Any such written confirmation shall be submitted to the Planning Authority within 6 weeks of works commencing.
The planning source could not be checked just now. Showing matching records already saved; newer applications or decisions may be missing. Your area and filters have not been changed. Applications are collected from council open data where connected and PlanIt for other coverage. A council register is not counted as a backup until its feed is connected. Area boundaries use ONS and Planning Data where available. Check the council record for current decisions and documents.
SAVED REPORTSave this reportKeep this exact planning view in My Places.
Area alerts will be available after a complete source check. Existing watches remain saved.
Checking your analytics preference.
Help improve Place KeysGoogle Analytics is on to help us understand how our public pages are used. You can turn it off at any time. About analytics & cookies