11 Lyal Road, London, E3 5QG
Proposed single-storey rear infill side extension
- Reference
- PA/26/01517/NC
- Application date
- 4 Sep 2026
Search the selected area by proposal, reference, status, type, authority or date.
149 applications found.
Proposed single-storey rear infill side extension
Letter of comfort pursuant to paragraph 2.1 and 2.2 of Schedule 7 (S278 Agreement and Traffic Management Orders) of Deed of planning obligation dated 03rd November 2022 and as varied 17th July 2024, 02nd October 2024 and 04th August 2026 (Planning reference 21/00455/FUL_LLDC)
Approval of details pursuant to Condition 50 (Ventilation Strategy) attached to Planning Consent 23/00305/FUL (LLDC) dated 06th September 2024.
Replacement of the existing rear window with a double-glazed heritage-style uPVC sash window, installation of two rooflights to provide natural light and roof access, and replacement of the existing front boundary wall with metal railings.
Submission of details pursuant to condition no.5 (Biodiversity Gain Plan) in relation to Phase 1 of planning permission ref: LL/24/00277/FUL, dated 25/11/2024
Application for a Non-Material Amendment (S96a) to planning permission ref. 24/00277/FUL dated 25/11/2024. Amendment: To alter Condition 3 to revise the cycle track works, planting areas, rain gardens, tree planting locations, seating, crossing points, pedestrian access arrangements, and lighting column provision within Phase 1 of the approved development.
Removal of wild cherry tree next to railway. Job: T1 Cherry ? Climb and dismantle to ground level. All arisings to be removed and site left clean and tidy
Application for a Non-Material Amendment (S96a) to planning permission ref. 24/00277/FUL dated 25/11/2024. Amendment: To alter Condition 3 to revise the cycle track works, planting areas, rain gardens, tree planting locations, seating, crossing points, pedestrian access arrangements, and lighting column provision within Phase 1 of the approved development.
Submission of details pursuant to condition no.5 (Code of Construction Practice Checklist) of planning permission ref: PA/24/00164, dated 06/12/2024
Observation by Newham London for the retention of the London Stadium as a multi-purpose sports, music, culture and community events venue with minor amendments to planning conditions relating to event restrictions set out in the extant planning permission (planning application reference 20/00060/VAR) In order to allow:- Increase in annual events from 10 to 24;- Increase maximum capacity for events to 85,000 for 8 events and maintain current capacity of 80,000 for 16 events;- Increase in consecutive nights of concerts from 3 to 4 (at a maximum of 4 occurrences per year);- Operate all events at a maximum music noise level of 75 dB;- Increase capacity for all sports events to 62,500 to match capacity for West Ham games;- Reduce annual frequency of sports events from 87 to 70; and- Include uniquely run sports events such as boxing and Soccer Aid within the definition for Events
Approval of details pursuant to Condition 24 (Secured by Design) relating to first part of condition ('Prior to commencement of above ground level superstructure works') attached to Planning Consent 23/00305/FUL (LLDC) dated 06th September 2024.
Erection of an outbuilding
Erection of an outbuilding
Like-for-like replacement of the impact-damaged front boundary railings, together with the repair and reinstatement of the associated front boundary, including partial rebuilding of the brick retaining wall to the basement lightwell, replacement of the natural stone coping, and reinstatement of the entrance steps and associated hard landscaping using matching materials and traditional construction methods.
Like-for-like replacement of the impact-damaged listed wrought iron railings, together with the repair and reinstatement of the associated front boundary, including partially rebuilding a small section of the brick retaining wall, replacement of the natural stone coping and reinstatement of the entrance steps and associated hard landscaping.
Approval of details pursuant to Condition 25 (Material Samples and Detailed Design) attached to Planning Consent 23/00305/FUL (LLDC) dated 06th September 2024.
Replacement of existing damaged uPVC balcony doors with aluminium bi-fold doors on a like-for-like basis, with no alterations to the size, appearance, or external aesthetics of the building and no associated structural works..
Replacement of existing damaged uPVC balcony doors with aluminium bi-fold doors on a like-for-like basis, with no alterations to the size, appearance, or external aesthetics of the building and no associated structural works.
Approval of details pursuant to Condition 25 (Remediation Statement) and Condition 27 (Contamination Assessment, Remediation Strategy and Methodology) relating to Phase 1 attached to Planning Consent 21/00574/OUT (LLDC) dated 18th September 2023.
Approval of details pursuant to Condition 10 (Site Waste Management Plan), Condition 12 (Air Quality), Condition 14 (Noise Assessment), Condition 21 (Surface Water Drainage Details), Condition 31 (Fabric Energy Efficiency Standards (FEES)), Condition 32 (Green Infrastructure), Condition 38 (Car Parking and Design Management Plan), Condition 39 (Car Parking Permits), Condition 40 (Car Club), Condition 41 (Electric Charging Point Provision), Condition 45 (Delivery and Servicing Strategy), Condition 46 (Cycle Parking Provision), Condition 47 (Sound Insulation and Internal Noise Levels), Condition 51 (Wind), Condition 56 (Arboricultural Report) and Condition 57 (Flood Resilience) relating to Phase 2A only attached to Planning Consent 21/00574/OUT (LLDC) dated 18th September 2023.
Non-material amendment to planning consent ref: 21/00574/OUT (LLDC) dated 18th September 2023, comprising deviations to the approved parameter plans and design codes listed in Condition 1 of the PML OPP.
Retention of the London Stadium as a multi-purpose sports, music, culture and community events venue with minor amendments to planning conditions relating to event restrictions set out in the extant planning permission (planning application reference 20/00060/VAR) In order to allow: - Increase in annual events ; - Increase maximum capacity for some events; - Increase in consecutive nights of concerts from - Operate all events at a maximum music noise level of 75 dB; - Increase capacity for all sports events - Reduce annual frequency of sports events; and - Include uniquely run sports events such as boxing and Soccer Aid within the definition for Events.
Approval of details pursuant to Condition 13 (Construction Noise and Vibration) relating to Phase 1 attached to Planning Consent 21/00574/OUT (LLDC) dated 18th September 2023.
Approval of details pursuant to Condition 59 (Archaeological investigation) relating to Phase 1 attached to Planning Consent 21/00574/OUT (LLDC) dated 18th September 2023.
Check recent applications before setting up alerts. This prevents older applications being sent as new alerts.
Preparation uses a shared source check. Busy sources or larger areas may need the next scheduled collection. No alerts are enabled or emails sent by this step.