See applications in the area below, alongside planning rules and protections at your chosen location.
Within 0.62 miles of N7 9DQApplication dates: 21 Sep 2025 to 21 Sep 2026Showing applications within 0.62 miles of this postcode.
193applications found0Types of mapped rules or protections found here, such as conservation areas, listed buildings or flood-risk zones. We count each type once, separately from applications. A zero means none were returned by our data sources; other restrictions may still apply.
SEARCH APPLICATIONS
Narrow your search
Search the selected area by proposal, reference, status, type, authority or date.
Notification of Prior Approval for the change of use of basement and ground floor of commercial unit (Class E) to residential accommodation to provide 1 x 1 bedroom residential unit (Class C3) under 'Class MA' of Schedule 2, Part 3 of the Town and Country Planning (General Permitted Development) Order (GPDO) 2015 (as amended)
Installation of a riser pipe network from the isolation valve, including a meter box to the basement flat and a pipe to feed Flats 1, 2, and 3 (Retrospective)
Erection of second storey rear extension to outrigger with rear french doors and side window, widening of front and rear dormers with new juliet balcony to the rear and new window to the rear
Conversion of internal parking space into habitable space incorporating new timber/glazed screen and bin store and two new side windows at ground floor.
Demolition of the existing workshop/garage and erection of a single-storey two bedroom dwellinghouse, together with access gate, landscaping, cycle and refuse storage and associated works.
Approval of details application pursuant to the discharge of Condition 6 (Construction Management) of planning permission ref. P2022/1067/FUL, dated 29/11/2023
Approval of details application pursuant to the discharge of Condition 31 (Demolition and Construction Methodology) of planning permission ref. P2022/1067/FUL, dated 29/11/2023
Retention and relocation of existing food truck, installation of 2 no. pergola structures, provision of outdoor tables, chairs, planters and benches and associated works
Conversion of existing garage to habitable space, replacement of front garage doors with brickwork and windows, and formation of an enclosed front porch
The subject tree is identified as T1 in the attached drawing. T1 is a multi-trunk holly tree which has been overgrown. The proposal is to trim the branches by 40% to enable the erection of the scaffold for the restoration of St Andrew's Tower & Spire.
External refurbishment of Garages G12 and G13, comprising: replacement of existing roof with new flat asphalt roof with three rooflights; replacement of existing front entrance doors with new painted timber bi-fold and tri-fold doors; replacement of existing front clerestory windows with full-width painted timber-framed glazing; replacement of existing rear clerestory windows on a like-for-like basis with timber-framed heritage glazing; and reinstatement of gateway to east elevation of G13.
Suggested works are to remove lowest lateral limb on the South Western side of the canopy back to the main trunk to improve balance and clearance from the street light Thin the remainder of the tree by 10% and raise canopy height all round to statutory clearance of 5.5m above ground level Statement of reasons for works to a TPO tree: Improve light levels to surrounding areas Routine maintenance Improve clearance above ground level
Approval of details pursuant to Condition 4 of listed building consent ref. P2025/1745/LBC dated 25/09/2025 for 'Demolish existing roof construction and replace with roof mansard extension with roof terrace and PV, cover rear light well in laminated ultra clear iron-free glazing to form wintergarden with associated external alterations, air source heat pump, with internal alterations'
Erection of first floor part rear extension; formation of new window opening at first floor level and replacement of existing rear single glazed metal framed windows with double glazed timber framed windows
Proposed refurbishment and repairs to the existing bridge from the pavement to the main entrance door. Replacement glazing to various lower ground floor windows and doors. New Victorian timber shutter to lower ground floor front windows. Existing low level brick planter in rear garden reduced in size. New timber framed secondary glazing to the second floor master bathroom suite.
T1 Oak (Turkey) Remove The tree works are proposed to stop the influence of the tree(s) on the soil below building foundation level and provide long term stability.to 80 Gifford Street London N1 0DF Estimated costs of repair to the building are £65,000.00 if the influence of the tree(s) remain and £26,598.81 if the proposed tree works are allowed to proceed. Granting permission will limit these costs. In the event of a refusal we, or our clients, will seek to secure compensation for the additional costs incurred through Section 202(e). Should the tree/s remain the total cost of repairs will be the Superstructural repairs + Alternative method of repairs = £91,598.81 It is the expert opinion of both the case engineer and arboriculturalist that on the balance of probabilities the supporting information demonstrates the influence of the tree(s). Note: Further monitoring results may be submitted if these become available during the course of this application.
Overhauling and/or replacement of existing glazing and/or windows, improved airtightness and ventilation, vapour-open loft insulation, new main roof-mounted photovoltaic solar panel array and battery storage.
← PreviousPage 3 of 9Next → Planning information from local councils and PlanIt. Area boundaries use ONS and Planning Data where available. Check the council record for the latest decisions and documents.
SAVED REPORTSave this reportKeep this exact planning view in My Places.
Watch this area
Check recent applications before setting up alerts. This prevents older applications being sent as new alerts.
Preparation uses a shared source check. Busy sources or larger areas may need the next scheduled collection. No alerts are enabled or emails sent by this step.
Checking your analytics preference.
Help improve Place KeysGoogle Analytics is on to help us understand how our public pages are used. You can turn it off at any time. About analytics & cookies