34 Wilson Gardens, Newcastle Upon Tyne, NE3 4JA
Trees in a Conservation Area Notification: Poplar (T1 on Sketch Plan) - Pollard at 8ft to minimise overhang, Willow (T2 on Sketch Plan) - Fell
- Reference
- 2026/1065/01/TCA
- Application date
- 30 Jun 2026
Search the selected area by proposal, reference, status, type, authority or date.
29 applications found.
Trees in a Conservation Area Notification: Poplar (T1 on Sketch Plan) - Pollard at 8ft to minimise overhang, Willow (T2 on Sketch Plan) - Fell
Trees in a Conservation Area Notification: Whitebeam (T1 on Sketch Plan) – Fell, Holly ( T2 on Sketch Plan) - Pollard at 7ft to reform crown at a manageable height, Cherry (T3 on Sketch Plan) - reduce crown by 1.5m to maintain shape
Notification for Prior Approval: Erection of a single storey extension to rear, height to eaves 2.25 metres, maximum height of extension 3.40 metres, total projection from rear wall of original house 4.50 metres.
TPO Application: On sketch plan (T1) Crown raise. T2 and T3 to give 5.2m clearance from ground level. (T33 - 1998/08) Crown raise to give 5.5m clearance from ground level (Statutory road clearance).
Trees in a Conservation Area Notification: Cherry (C1): crown reduction by 1.5m, Crabapple (A1): crown thin by 10% , Holly (H1): crown reduction by 1.5m, Plum (P1): crown reduction by 1m, Elder (E1): to fell, Hawthorn (H1): crown reduction by 2m, Holly (H2): to fell, . Holly (H3): crown reduction by 1m, Conifer (C1): to fell,. Holly (H4): crown reduction by 1m and Laburnum (L1): to fell.
TPO Application: (T164 – T193) Mix of Lime & Sycamore (G6 on Sketch Plan), (T194 – T220) – Mix of Lime, Beech, Ash & Sycamore (G6 on Sketch Plan) - crown raise to 2.5 metres in both groups, no wounds to be made larger than 75mm (TPO 2024/08)
Trees in a Conservation Area Notification: Beechtree (Fagus sylvatica) to be felled.
Installation of external wheelchair lift (Retrospective)
Lawful Development Certificate for proposed single storey extension to side/front.
Erection of single storey extension to front and a first floor extension to side and alterations to elevations.
Erection of first floor extension to front.
Minor Material amendment: Variation of condition 2 (Amendment to approved plans to apply a render finish to side and rear elevations) to planning permission 2026/0219/01/HOU dated 30.03.2026. Erection of two storey extension to front, first floor extension to side, single storey extension to rear, alterations to elevations including render to front and side elevations, installation of driveway and boundary treatment (maximum height 1.2m) to front. As amended by plans received on 13.03.2026.
Erection of single storey extension to rear and first floor extension to side with porch to front.
Submission of details of cycle parking to comply with condition 8, electric vehicle charging points to comply with condition 10 and proposed highway parking restrictions to comply with condition 11 of Planning Permission 2023/0204/01/DET dated 04-03-2024
Lawful Development Certificate for proposed loft conversion with rear dormer window and installation of rooflight to front.
Lawful Development Certificate for proposed replacement of existing roof to single storey rear extension with fascia and guttering including installation of bi-fold doors to rear and picture window to side.
Erection of single storey extension to rear side with 2 no. Velux rooflights
Installation of dropped kerb to highway for access to driveway.
Erection of a rear flat roof dormer extension.
Trees in a Conservation Area Notification: Apple - Fell
Trees in a conservation area notification: Holly tree to fell and Bay Laurel tree to fell.
Trees in a Conservation Area Notification: Crabapple tree (C1) to be removed.
Erection of single-storey rear extension with flat roof, new flat roof to existing single storey element to side, alterations to elevations including canopy to front, and driveway to front. As amended by plans received on 16.06.2026.
Erection of porch, single storey extension to rear and alterations to elevations (retrospective).
Check recent applications before setting up alerts. This prevents older applications being sent as new alerts.
Preparation uses a shared source check. Busy sources or larger areas may need the next scheduled collection. No alerts are enabled or emails sent by this step.