Flat 1 80 Earlham Road Norwich NR2 3DF
Ash (T1): crown reduction to reduce height from 11m to 7m and reduce crown spread from 7m to 4m.
- Reference
- 26/00878/TCA
- Application date
- 3 September 2026
Around NR2 4NA · Wensum ward. Results use the search distance below.
18 applications found.
Ash (T1): crown reduction to reduce height from 11m to 7m and reduce crown spread from 7m to 4m.
Erecting a veranda at the rear of building to create a wellbeing centre.
T1, T2 - Swedish birch: Fell.
Change of use to managers/staff accommodation, to include external alterations, new doors/windows if required.
Change of use from car sales and vehicle workshop premises to allow public car washing together with the erection of an associated three sided vehicle preparation canopy, boundary acoustic fencing and an internal acoustic site screen.
Display of 3no. flagpoles.
Details of Conditions 6: boundary treatments, Condition 7: landscaping scheme, Condition 8: flood warning and evacuation plan of previous permission 23/00598/F.
Amendment to approved plans of planning permission 25/00338/F.
T1 Silver Birch : Clear building by 2m. No change to overall height or spread.
Amendment to planning permission 24/00134/NF3 to finalise the substation location.
Change of use of former Waste Recycling Centre to flexible use within Use Classes E(g)(ii) and (iii), B2 and B8
Construction of 9 No. industrial units to provide flexible and adaptable space for Use Classes E(g)(ii), and Class E(g)(iii), General Industrial Use Class B2 and Ancillary Accommodation, Parking & Landscaping.
Change of use from hot tub & swimspa centre (Class E or B8) to mixed use comprising brewery (Class B2), small tap (bar) (sui generis) and retail area.
Details of Condition 17: further details on Subadra Consulting Updated Appraisal of Proposed Replacement Petroleum Installation; Condition 20: further details on Subadra Consulting Updated Geo-Environmental Investigation Report and Condition 22: details on piling methods of previous permission 25/00338/F.
Single storey rear extension.
Details of Condition 3 (parts 1 to 4): contamination assessment, Condition 8: noise management plan, Condition 10: construction management plan, Condition 18: remediation strategy of previous permission 25/00338/F.
Details of Condition 32: electricity substation of previous permission 24/00134/NF3.
Details of Condition 4: construction management plan of previous permission 25/00337/F.
Follow NR2 4NA for new applications. Keep your places together in My planning.
Within 0.62 miles of NR2 4NAPermission, permitted development and what happens next. Find your starting point.