See applications in the area below, alongside planning rules and protections at your chosen location.
Within 0.62 miles of RH6 7NBApplication dates: 25 Sep 2025 to 25 Sep 2026Showing applications within 0.62 miles of this postcode.
41applications found0Types of mapped rules or protections found here, such as conservation areas, listed buildings or flood-risk zones. We count each type once, separately from applications. A zero means none were returned by our data sources; other restrictions may still apply.
SEARCH APPLICATIONS
Narrow your search
Search the selected area by proposal, reference, status, type, authority or date.
Submission of Tree Protection Plan details pursuant to condition 7 of permission 26/00380/F. Resurfacing of the existing car park, installation of marked parking bays with two designated disabled parking spaces, provision of one electric vehicle charging point, improvement of pedestrian pathways at the front of the site, and creation of a clearly defined accessible route to the Community Sensory Garden and the existing ramped entrance.
Demolition of existing structures & erection of 4no x flexible start-up commercial units (Use Classes B8, E(a), E(c), E(d), E(e), E(g)) at ground floor with 2 No x 7 bedroom (Use class sui generis) houses in multiple occupation above providing 14 bedrooms.
Submission of Biodiversity Statement details pursuant to condition 8 of permission 26/00380/F. Resurfacing of the existing car park, installation of marked parking bays with two designated disabled parking spaces, provision of one electric vehicle charging point, improvement of pedestrian pathways at the front of the site, and creation of a clearly defined accessible route to the Community Sensory Garden and the existing ramped entrance.
Submission of construction transport management plan details pursuant to condition 8 of permission 25/01984/F. External alterations and also a proposed first floor rear extension providing for 1 flat and a new roof floor providing for 4 further flats.
Submission of external material details pursuant to Condition 3 of permission 25/01984/F. External alterations and also a proposed first floor rear extension providing for 1 flat and a new roof floor providing for 4 further flats.
Submission of a Water Efficiency Statement pursuant to Condition 7 of permission 25/01984/F. External alterations and also a proposed first floor rear extension providing for 1 flat and a new roof floor providing for 4 further flats.
Submission of Tree Protection Plan and Arboricultural Method Statement details pursuant to condition 10 of permission 25/00386/F. Demolition of existing building and erection of a new care home (Class C2).
Submission of ground level details pursuant to condition 3 of permission 25/00386/F. Demolition of existing building and erection of a new care home (Class C2). As amended on 01/09/2026.
Submission of post-installation noise assessment details pursuant to condition 34 of permission 22/01400/F. Demolition of existing building and redevelopment of the site to provide a Class E(a) retail foodstore with associated parking, access and landscaping.
T1 - declining sycamore, tree is approximately 22-26 meters in height, top 10-15 meters dead, signs of decay at base, recommended to fell ASAP. T2 - declining horse chestnut, tree is approximately 20-24 meters in height, woodpecker hole 10-12 meters from ground level, additional 10 meters above hole in extremely bad decline, at base, signs of decay present at base, recommended to fell ASAP
The 3 dead trees are amongst others and also bushes in the first quarter of the boundary with the allotment gardens, starting from the Church Road (southern end) of the boundary. One is understood to be a cherry tree. The two others cannot be identified. We need to cut them down carefully to a safe height, including to remove any high level branches, before the dead trees become a safety concern. This will probably mean effectively cutting the trees down to almost ground level (withing about 300mm or so).
Submission of surface water drainage verification report pursuant to Condition 10 of permission 22/01400/F. Demolition of existing building and redevelopment of the site to provide a Class E(a) retail foodstore with associated parking, access and landscaping.
1. Yew rear garden RH corner. Crown Lift to provide 2 metres clearance from neighbours shed. height pre 13m post 13m crown spread pre 7m post 6m. 2. Yew rear boundary. Reduce encroachment toward fence by 1m. height pre 9m post 9m crown spread pre 5m post 5m 3. Sycamore rear boundary. Crown Lift over lawn only to provide 5 metres clearance from ground level
Extension & refurbishment of existing building and change of use from a C2 assisted living facility, to Sui Generis House in Multiple Occupation (HMO) providing 11 bedrooms.
Submission of surface water drainage scheme details pursuant to condition 9 of permission 22/02450/F. Construction of a 6-storey building for residential use (Class C3) connected to the existing building at 121-129 Victoria Road, including car parking, cycle parking, plant room and refuse store, landscaping, installation of PV panels to the roof of the existing and proposed building, and associated works. As amended on 10/08/2026
Submission of Landscape and Ecological Management Plan details pursuant to condition 8 of permission 22/02450/F. Construction of a 6-storey building for residential use (Class C3) connected to the existing building at 121-129 Victoria Road, including car parking, cycle parking, plant room and refuse store, landscaping, installation of PV panels to the roof of the existing and proposed building, and associated works. As amended on 12.08.2026
Submission of accessible and adaptable details pursuant to condition 13 of permission 22/02450/F. Construction of a 6-storey building for residential use (Class C3) connected to the existing building at 121-129 Victoria Road, including car parking, cycle parking, plant room and refuse store, landscaping, installation of PV panels to the roof of the existing and proposed building, and associated works. As amended on 24/06/2026.
Page 1 of 2Next → Planning information from local councils and PlanIt. Area boundaries use ONS and Planning Data where available. Check the council record for the latest decisions and documents.
SAVED REPORTSave this reportKeep this exact planning view in My Places.
Watch this area
Check recent applications before setting up alerts. This prevents older applications being sent as new alerts.
Preparation uses a shared source check. Busy sources or larger areas may need the next scheduled collection. No alerts are enabled or emails sent by this step.
Checking your analytics preference.
Help improve Place KeysGoogle Analytics is on to help us understand how our public pages are used. You can turn it off at any time. About analytics & cookies