45 Oxley Close London Southwark SE1 5HF
Single storey ground floor rear extension.
- Reference
- 26/AP/2680
- Application date
- 9 Sep 2026
Search the selected area by proposal, reference, status, type, authority or date.
27 applications found.
Single storey ground floor rear extension.
Single storey ground floor rear extension and 1st floor rear extension with new gable pitched roof.
Details of Condition 4 'Overheating assessment' required by planinng permission ref. 21/AP/0054 'Erection of a mansard roof extension to provide 9 new residential dwellings (C3), through the removal and replacement of the original butterfly roof structure and parapet together with reinstating the Victorian architectural details on the facade, improvements to the existing refuse facilities and cycle storage.'
Works to tree with a TPO: T1 = To crown reduce 1 x London plane tree by 2.0/2.5 mtrs. Raise the crown and remove deadwood. light access, general maintenanace, neighbouring property encroachment.
New signage to the new build burger king unit on the retail park.
Details of Condition 7 'Material schedule and sample panels' required by planning permission ref. 20/AP/2993 (as amended by 26/AP/2205) which gave consent for: "Demolition of existing building and the development of a mixed-use development of up to 14 storeys in height plus a basement to provide up to 183 residential units (Use Class C3); flexible retail/restaurant/office (Use Class E) floorspace at ground floor and part first floor levels; plus associated public realm works, landscaping, car and cycle parking, and associated works. The application is supported by an Environmental Statement (ES) and a corresponding Addendum in line with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017".
Details of Condition 6 'Samples of all external facing materials and mock-up of facades' required by planning permission ref. 20/AP/2993 (as amended by 26/AP/2205) which gave consent for: "Demolition of existing building and the development of a mixed-use development of up to 14 storeys in height plus a basement to provide up to 183 residential units (Use Class C3); flexible retail/restaurant/office (Use Class E) floorspace at ground floor and part first floor levels; plus associated public realm works, landscaping, car and cycle parking, and associated works. The application is supported by an Environmental Statement (ES) and a corresponding Addendum in line with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017".
Details of condition 86 (Circular Economy Statement - Post Completion) relating to Building 1-4 only, as required by planning permission ref. 23/AP/2124 dated 12/03/2024 for 'Demolition, alterations and extension of existing buildings and erection of new buildings comprising a mixed-use scheme including providing new dwellings (Class C3), flexible Class A1/A3/A4/B1/D1/D2, flexible multi-use Class A1/A3/A4/D1 floorspace within retained Block BF-F, and a new secondary school. The development also includes communal amenity space, landscaping, children's playspace, car and cycle parking, installation of plant, new pedestrian, vehicular and servicing routes, the creation of two new pedestrian routes through the Railway Arches and associated works; and Outline planning permission (with all matters reserved) for the part demolition and part retention of existing buildings and erection of two new buildings comprising a mixed-use scheme, providing new homes (Class C3) and flexible multi-use floorspace (Class A1/A3/A4/D1), and other associated works. Amendments to planning permission 17/AP/4088 and variation of its conditions including: Increase the total number of homes from 1536 to 1624 Increased provision of social rent homes Changes to massing and architecture Changes to the quantum and allocation of non-residential floorspace Removal of block R and basement under block RST with its ramp Revised provision of public realm, playspace and tree planting Enhanced fire strategy for each building Increased communal spaces for residents Reconfigured parking provision Revised energy and overheating strategy'.
Partial discharge of condition 87 'Whole life carbon - Post occupation ' (Block 1-4) required by planning permission ref no. 23/AP/2124
Details of condition 45 (Delivery and servicing plan) in relation to Block DE as required by planning permission ref. 23/AP/2124 dated ref. 12/03/2024 for 'Demolition, alterations and extension of existing buildings and erection of new buildings comprising a mixed-use scheme including providing new dwellings (Class C3), flexible Class A1/A3/A4/B1/D1/D2, flexible multi-use Class A1/A3/A4/D1 floorspace within retained Block BF-F, and a new secondary school. The development also includes communal amenity space, landscaping, children's playspace, car and cycle parking, installation of plant, new pedestrian, vehicular and servicing routes, the creation of two new pedestrian routes through the Railway Arches and associated works; and Outline planning permission (with all matters reserved) for the part demolition and part retention of existing buildings and erection of two new buildings comprising a mixed-use scheme, providing new homes (Class C3) and flexible multi-use floorspace (Class A1/A3/A4/D1), and other associated works. Amendments to planning permission 17/AP/4088 and variation of its conditions including: Increase the total number of homes from 1536 to 1624 Increased provision of social rent homes Changes to massing and architecture Changes to the quantum and allocation of non-residential floorspace Removal of block R and basement under block RST with its ramp Revised provision of public realm, playspace and tree planting Enhanced fire strategy for each building Increased communal spaces for residents Reconfigured parking provision Revised energy and overheating strategy'.
Works to tree with a TCA: X1 Tree of heaven: Fell Reason: Poor location, to mitigate issues with wall, invasive tree of heaven species with limited useful life where in close proximity to the wall, tree was previously reduced in 2023 to try and curtail it, however it has grown back aggressively, the tree officer at the time even said he would support the removal of it due to species
Details of condition 30 (Secured by Design) relating to Building ST only, as required by planning permission ref. 23/AP/2124 dated 12/03/2024 for 'Demolition, alterations and extension of existing buildings and erection of new buildings comprising a mixed-use scheme including providing new dwellings (Class C3), flexible Class A1/A3/A4/B1/D1/D2, flexible multi-use Class A1/A3/A4/D1 floorspace within retained Block BF-F, and a new secondary school. The development also includes communal amenity space, landscaping, children's playspace, car and cycle parking, installation of plant, new pedestrian, vehicular and servicing routes, the creation of two new pedestrian routes through the Railway Arches and associated works; and Outline planning permission (with all matters reserved) for the part demolition and part retention of existing buildings and erection of two new buildings comprising a mixed-use scheme, providing new homes (Class C3) and flexible multi-use floorspace (Class A1/A3/A4/D1), and other associated works. Amendments to planning permission 17/AP/4088 and variation of its conditions including: Increase the total number of homes from 1536 to 1624 Increased provision of social rent homes Changes to massing and architecture Changes to the quantum and allocation of non-residential floorspace Removal of block R and basement under block RST with its ramp Revised provision of public realm, playspace and tree planting Enhanced fire strategy for each building Increased communal spaces for residents Reconfigured parking provision Revised energy and overheating strategy'.
Dispay of Internally illuminated totem sign
Certificate of Lawfulness (proposed) for installation of an InPost parcel locker, including associated fixing/anchoring works to securely position the unit on the right-hand side of the existing shop front.
Five day notification for tree works: G1 (group of ash trees) - Circa 2m overall reduction and lift to 3m.
Notice of Demolition for Bermondsey Phase 3 (Rich Industrial Estate, Planning Ref. 20/AP/2993. Schedule 1, Paragraph 5.1.2 of the Section 106 Agreement. As demolition of existing building and the development of a mixed-use development of up to 14 storeys in height plus a basement to provide up to 183 residential units (Use Class C3); flexible retail/restaurant/office (Use Class E) floorspace at ground floor and part first floor levels; plus associated public realm works, landscaping, car and cycle parking, and associated works. The application is supported by an Environmental Statement (ES) and a corresponding Addendum in line with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017.
Details of condition 3 (Archaeological Monitoring) as required by planning permission ref. 26/AP/0918 dated 01/07/2026 for 'New location for a below ground attenuation tank with connection to public sewers'
Certificate of lawful development (proposed) for a rear dormer with rooflights on front slope plus a new entrance porch
Installation of 7x air conditioning (AC) units on the ground floor facade of existing building and relocation of existing bike store area.
Renewal of all windows
Prior approval notification for the construction of a single storey extension measuring at 5.4m in depth, 3.0m maxium height and 4.7m in width
Details submitted to satisfy Schedule 9, Para 4.1 'Greenfield Run-off Rate Strategy' of the Section 106 Agreement associated with planning permission 20/AP/2993, which gave consent for: "Demolition of existing building and the development of a mixed-use development of up to 14 storeys in height plus a basement to provide up to 183 residential units (Use Class C3); flexible retail/restaurant/office (Use Class E) floorspace at ground floor and part first floor levels; plus associated public realm works, landscaping, car and cycle parking, and associated works. The application is supported by an Environmental Statement (ES) and a corresponding Addendum in line with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017".
Notification for Paragraph 22.6 (part b) of Commencement of Phase 11 (Building BF-W) as required by the section 106 agreement associated with planning permission ref. 23/AP/2124
Non-material amendment of planning permission 20/AP/2993, which gave consent for: "Demolition of existing building and the development of a mixed-use development of up to 14 storeys in height plus a basement to provide up to 183 residential units (Use Class C3); flexible retail/restaurant/office (Use Class E) floorspace at ground floor and part first floor levels; plus associated public realm works, landscaping, car and cycle parking, and associated works. The application is supported by an Environmental Statement (ES) and a corresponding Addendum in line with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017". Proposed amendments include a change to the approved CIL Phasing Plan (Condition 42 of permission 20/AP/2993) and a change to the wording of the BREEAM condition (Condition 30 of permission 20/AP/2993) to specify that BREEAM requirements shall apply to commercial units of 500sqm or more.
Check recent applications before setting up alerts. This prevents older applications being sent as new alerts.
Preparation uses a shared source check. Busy sources or larger areas may need the next scheduled collection. No alerts are enabled or emails sent by this step.
These rules were checked at the search location (SE16 3RQ). They do not necessarily apply to every address in the results area.
These describe protections or restrictions on the location. They are not planning applications or council decisions.
These are planning protections or restrictions that apply at the location we checked. They can affect what you are allowed to build, alter or demolish. The number beside a heading simply tells you how many overlapping map records were found — it is not a rating and it is not the number of planning applications.
This location is within a mapped flood-risk area. That can affect planning decisions and may be worth checking before buying.