Skip to content
Your places. Your possibilities.
Place Keys
PLANNING NEAR YOU

Planning in London

PLANNING IN SE19 3JD

Planning around SE19 3JD

See applications in the area below, alongside planning rules and protections at your chosen location.

Within 0.62 miles of SE19 3JDApplication dates: 20 Sep 2025 to 20 Sep 2026Showing applications within 0.62 miles of this postcode.
12applications found0
SEARCH APPLICATIONS

Narrow your search

Search the selected area by proposal, reference, status, type, authority or date.

Open the full SE19 3JD Area Guide →House prices in SE19 3JD →Find a property's sold prices →
PLANNING APPLICATIONS

Within 0.62 miles of SE19 3JD

12 applications found.

Some recent applications or decisions may not appear yet.
Approval of conditionsAwaiting decision

54A Beulah Hill Upper Norwood London SE19 3ER

Details pursuant to Condition 8 (Fire Safety Report) attached to planning permission 24/01818/OUT for the erection of 5no. three storey detached dwellings with a vehicle access from Harold Road. Other site alterations. Outline application with all matters reserved apart from scale.

Reference
26/02658/DISC
Application date
16 Sep 2026
Tree worksAwaiting decision

163 Gibson's Hill Norbury London SW16 3ES

T1 Weeping Willow: Reduce to previous reduction points and then a further 0.75m. T2 Magnolia: Reduce to previous reduction points plus 1m. T3 Yew: Reduce the crown by 0.5m. T4 Fir; Reduce the crown by 2m

Reference
26/02471/CAT
Application date
1 Sep 2026
Full planning applicationAwaiting decision

25 Maryland Road Thornton Heath CR7 8DG

Demolition of existing single storey attached garage. Construction of a hip to gable end roof extension, dormer extension within the rear roof slope and installation of two roolights within the front roof slope. Erection of a single/two storey side/rear extension.

Reference
26/02429/HSE
Application date
26 Aug 2026
Tree worksAwaiting decision

William Court 85 Highfield Hill Upper Norwood London SE19 3QF

T1 Sycamore tree - Reduce lateral branches on building side by 2m to clear the building T2 8m Cherry tree - Reduce lateral branches on building side by 2m to clear the building T3 4m Purple leaf Plum - Reduce lateral branches on building side by 1m to clear the building

Reference
26/02318/CAT
Application date
14 Aug 2026
Outline or preliminary applicationAwaiting decision

30 Florida Road Thornton Heath CR7 8EU

Erection of a single storey rear extension which projects out from the rear wall of the original house by 6 metres with an eaves height of 3 metres and a maximum height of 3 metres

Reference
26/02219/GPDO
Application date
5 Aug 2026
Full planning applicationAwaiting decision

14 Virginia Road Thornton Heath CR7 8EG

Erection of part single/part two storey side/rear extension, rear dormer window, conversion of garage into habitable accommodation, alterations to façade and associated works

Reference
26/02071/HSE
Application date
20 Jul 2026
Full planning applicationAwaiting decision

115 Northwood Road Thornton Heath CR7 8HW

Increase in the height of the roof by 300mm and erection of dormer extensions within the rear roof slopes. Installation of two roof lights in the front roof slope and erection of a single storey outbuilding within the rear garden.

Reference
26/02027/HSE
Application date
15 Jul 2026
Planning information from local councils and PlanIt. Area boundaries use ONS and Planning Data where available. Check the council record for the latest decisions and documents.
SAVED REPORTSave this reportKeep this exact planning view in My Places.
SAVE THIS REPORT

Keep this Place Keys report.

Enter your email and we’ll hold this exact report for you. You can then create a free account and it will move into My Places automatically.

We’ll use this email to save the report and send the link you asked for. This does not subscribe you to marketing. If you don’t create an account, the guest copy is automatically deleted after 30 days.

Watch this area

Check recent applications before setting up alerts. This prevents older applications being sent as new alerts.

Preparation uses a shared source check. Busy sources or larger areas may need the next scheduled collection. No alerts are enabled or emails sent by this step.