146 London Road Morden SM4 5AT
APPLICATION FOR VEHICULAR ACCESS AND ASSOCIATED FRONT HARDSTANDING
- Reference
- 26/P0072
- Application date
- 12 Jan 2026
Search the selected area by proposal, reference, status, type, authority or date.
40 applications found.
APPLICATION FOR VEHICULAR ACCESS AND ASSOCIATED FRONT HARDSTANDING
APPLICATION FOR VEHICULAR ACCESS AND ASSOCIATED FRONT HARDSTANDING
RAISING OF THE RIDGE BY 400M AND ERECTION OF MANSARD REAR DORMER, X3 ROOFLIGHTS TO THE FRONT ROOF SLOPE. ALTERATIONS TO FRONT AND REAR ELEVATIONS
FULL PLANNING APPLICATION FOR THE CONTINUED HOURS OF OPENING BEING MONDAY - SATURDAY 24 HOURS AND SUNDAY/BANK HOLIDAYS 08.00 - 22.00.
APPLICATION FOR A LAWFUL DEVELOPMENT CERTIFICATE IN RESPECT OF THE PROPOSED ERECTION OF A HIP TO GABLE, REAR DORMER ROOF EXTENSION AND 2 FRONT ROOFLIGHTS
OUT OF BOROUGH CONSULTATION FOR THE DEMOLITION OF EXISTING DWELLING AND GARAGE, ERECTION OF TWO-STOREY DETACHED DWELLING WITH ACCOMMODATION IN ROOF SPACE, EXCAVATION TO PROVIDE BASEMENT ACCOMMODATION AND ATTACHED GARAGE, ERECTION OF SINGLE-STOREY OUTBUILDING IN REAR GARDEN AND PROVISION OF ASSOCIATED LANDSCAPING AND REFUSE STORAGE
APPLICATION FOR VEHICULAR HARDSTANDING AND CHANGES TO BOUNDARY TREATMENTS
ERECTION OF TWO STOREY SIDE AND FIRST FLOOR REAR EXTENSION.
OUT OF BOROUGH CONSULTATION (FROM THE ROYAL BOROUGH OF KINGSTON) RELATING TO THE PLANNING APPLICATION FOR DEMOLITION OF EXISTING GASHOLDERS AND ASSOCIATED ABOVE GROUND STRUCTURES AND BUILDINGS. PHASED REDEVELOPMENT OF SITE TO PROVIDE 8 TO 16 STOREY 5NOS BLOCKS WITH 586 RESIDENTIAL UNITS AND ANCILLARY RESIDENTIAL FACILITIES (C3 USE CLASS), TOGETHER WITH ASSOCIATED WORKS TO THE EXISTING ACCESSES AND INTERNAL VEHICULAR ROUTES, NEW PEDESTRIAN AND CYCLE ROUTES, THE PROVISION OF NEW PUBLICLY ACCESSIBLE OPEN SPACE, AMENITY SPACE, HARD AND SOFT LANDSCAPING, CYCLE AND CAR PARKING, WORKS TO THE BROOK EMBANKMENT, RE[1]SITING OF SOME GAS INFRASTRUCTURE, GROUND WORKS AND PLANT AND ASSOCIATED WORKS. CROSS BOUNDARY APPLICATION WITH LB MERTON: DEVELOPMENT WITHIN MERTON COMPRISES WORKS TO EXISTING VEHICLE ACCESS ONTO WEST BARNES LANE, INCLUDING HARD AND SOFT LANDSCAPING AND NEW PUBLIC REALM AND ASSOCIATED GROUND WORKS, TO PROVIDE PEDESTRIAN AND CYCLE ROUTE WITH ACCESS FOR EMERGENCY VEHICLES ONLY, NEW PEDESTRIAN/CYCLE ACCESS ROUTES TO MARINA AVENUE AND SIR JOSEPH HOOD MEMORIAL GROUNDS. APPLICATION ACCOMPANIED BY AN ENVIRONMENTAL STATEMENT. AT GAS HOLDER STATION MOTSPUR PARK NEW MALDEN.
OUT OF BOROUGH CONSULTATION FOR THE ERECTION OF A SINGLE STOREY REAR EXTENSION WHICH PROJECTS OUT FROM THE REAR WALL OF THE ORIGINAL HOUSE BY 5.2 METRES, WITH AN EAVES HEIGHT OF 2.68 METRES AND A MAXIMUM ROOF HEIGHT OF 2.88 METRES
DEMOLITION OF EXISTING GASHOLDERS AND ASSOCIATED ABOVE GROUND STRUCTURES AND BUILDINGS. PHASED REDEVELOPMENT OF SITE TO PROVIDE 8 TO 16 STOREY 5NOS BLOCKS WITH 586 RESIDENTIAL UNITS AND ANCILLARY RESIDENTIAL FACILITIES (C3 USE CLASS), TOGETHER WITH ASSOCIATED WORKS TO THE EXISTING ACCESSES AND INTERNAL VEHICULAR ROUTES, NEW PEDESTRIAN AND CYCLE ROUTES, THE PROVISION OF NEW PUBLICLY ACCESSIBLE OPEN SPACE, AMENITY SPACE, HARD AND SOFT LANDSCAPING, CYCLE AND CAR PARKING, WORKS TO THE BROOK EMBANKMENT, RE-SITING OF SOME GAS INFRASTRUCTURE, GROUND WORKS AND PLANT AND ASSOCIATED WORKS. CROSS BOUNDARY APPLICATION WITH LB MERTON: DEVELOPMENT WITHIN MERTON COMPRISES WORKS TO EXISTING VEHICLE ACCESS ONTO WEST BARNES LANE, INCLUDING HARD AND SOFT LANDSCAPING AND NEW PUBLIC REALM AND ASSOCIATED GROUND WORKS, TO PROVIDE PEDESTRIAN AND CYCLE ROUTE WITH ACCESS FOR EMERGENCY VEHICLES ONLY, NEW PEDESTRIAN/CYCLE ACCESS ROUTES TO MARINA AVENUE AND SIR JOSEPH HOOD MEMORIAL GROUNDS. APPLICATION ACCOMPANIED BY AN ENVIRONMENTAL STATEMENT.
THE PROPOSED WORKS INVOLVE THE REFURBISHMENT AND MODERNISATION OF THE EXISTING SHOPFRONT OF A FORMER BANK PREMISES LOCATED ON MORDEN HIGH STREET.
REPLACEMENT INTERNALLY ILLUMINATED FASCIA SIGNAGE AND PROJECTING SIGN
OUT OF BOROUGH CONSULTATION FOR THE PROPOSED LAND RESTORATION IN ACCORDANCE WITH THE REVISED RESTORATION MANAGEMENT PLAN FOR THE BEDDINGTON LANDFILL SITE AND IMPLEMENTATION OF THE PROPOSED RESTORATION WORKS INCLUDING THE ERECTION OF A SINGLE STOREY DETACHED AGRICULTURAL BUILDING, ERECTION OF A SINGLE STOREY DETACHED EXTERNAL HOUSING CONTROL UNIT, EXTENSION TO EXISTING VEHICLE CROSSOVERS, INSTALLATION OF VEHICULAR AND PEDESTRIAN ACCESS GATES, SECURITY AND PREDATOR FENCING, AND SEATING. FURTHER TO MY EARLIER LETTER ADVISING YOU ABOUT THIS PLANNING APPLICATION I HAVE NOW RECEIVED A REVISION TO THE APPLICATION AS SUMMARISED BELOW; REVISED DOCUMENTS RECEIVED: COVERING LETTER 15.09.2025 BEDDINGTON PROGRAMME JUNE 2025 WATER RESOURCE ASSESSMENT ECL.10136.R05.001 WRA REV E ACCESS PROPOSALS AUGUST 2025
OUT OF BOROUGH CONSULTATION FOR THE ERECTION OF A SINGLE STOREY REAR EXTENSION WHICH PROJECTS OUT FROM THE REAR WALL OF THE ORIGINAL HOUSE BY 6 METRES, WITH AN EAVES HEIGHT OF 2.7 METRES AND A MAXIMUM ROOF HEIGHT OF 2.7 METRES.
OUT OF BOROUGH CONSULTATION FOR THE ERECTION OF A SINGLE STOREY REAR EXTENSION WHICH PROJECTS OUT FROM THE REAR WALL OF THE ORIGINAL HOUSE BY 6 METRES, WITH AN EAVES HEIGHT OF 2.7 METRES AND A MAXIMUM ROOF HEIGHT OF 2.7 METRES.
Check recent applications before setting up alerts. This prevents older applications being sent as new alerts.
Preparation uses a shared source check. Busy sources or larger areas may need the next scheduled collection. No alerts are enabled or emails sent by this step.