Skip to content
Your places. Your possibilities.
Place Keys
PLANNING NEAR YOU

Planning in Richmond upon Thames

PLANNING IN SW14 7PJ

Planning around SW14 7PJ

See applications in the area below, alongside planning rules and protections at your chosen location.

Within 0.62 miles of SW14 7PJApplication dates: 21 Sep 2025 to 21 Sep 2026Showing applications within 0.62 miles of this postcode.
22applications found0
SEARCH APPLICATIONS

Narrow your search

Search the selected area by proposal, reference, status, type, authority or date.

Open the full SW14 7PJ Area Guide →House prices in SW14 7PJ →Find a property's sold prices →
PLANNING APPLICATIONS

Within 0.62 miles of SW14 7PJ

22 applications found.

Some recent applications or decisions may not appear yet.
Outline or preliminary applicationAwaiting decision

31 Fife Road East Sheen London SW14 7EJ

The proposed development comprises of an amendment to an existing side elevation window and door. The proposal seeks to combine these two openings to one opening. This will accomodate a four panels sliding door to the same proportions and material as the existing timber sash windows.

Reference
PA26/3223
Application date
17 Sep 2026
Amendment to an existing permissionApproved

283, Lower Richmond Road, Richmond, TW9 4LU

Rear dormer alterations, rooflights to front elevation, front garden alterations. [Non-material amendment to planning permission PA26/1424 to allow change to approved external cladding of the rear dormer from clay tiles to slate.]

Reference
PA26/3000
Application date
28 Aug 2026
Decision date
1 Sep 2026
Tree worksAwaiting decision

19a Alder Road, Mortlake

Back Garden (Left Boundary) T1: Apple tree – • Re-prune by approximately 1.5m back to previous points • Thin canopy by 10% • Remove major deadwood Height of tree currently: 3.5M Height of tree after reduction: 2M Spread of tree currently: 2.5M Spread of tree after reduction: 1.5M (Back Boundary) T2: Cherry tree – • Re-prune by approximately 1 - 1.5m back to previous points • Thin canopy by 10% • Remove major deadwood Height of tree currently: 6M Height of tree after reduction: 5M Spread of tree currently: 5 Spread of tree after reduction: 4M T3: Bay tree – • Trim tight to shape by approximately 1.5m • Clear overhang from the solar panels Height of tree currently: 5M Height of tree after reduction: 4M Spread of tree currently: 4M Spread of tree after reduction: 3M Reasons for work: General tree maintenance More light Clearance from building Maintaining tree in its current setting Overhanging footpath

Reference
PA26/2964
Application date
26 Aug 2026
Tree worksAwaiting decision

7 Crane Court, Sheen Gate Gardens, East Sheen.

Robinia T1 - extensive basal decay. Pollard to height of approx 15m from the ground. Tree height 25m and spread 20m and final height 15m and spread 10m. Ash T2 - whole tree reduction to 6m above the ground and give clearance from building.

Reference
PA26/2939
Application date
25 Aug 2026
Approval of conditionsAwaiting decision

Garages And Land Adjacent Railway South Worple Way East Sheen London

Details pursuant to conditions U0188816 - Cycle Parking - Residential, U0188817 - Refuse Arrangements - Residential, U0188824 - External Lighting, U0188837 - Renewable Energy Details, U0188838 - ASHP Acoustic Detail and DV49A - Construction Management Plan of planning permission 23/1565/OUT.

Reference
PA26/2900
Application date
20 Aug 2026
Full planning applicationAwaiting decision

15, Berwyn Road, Richmond, TW10 5BP

Replacement ground floor rear extension. Replacement of existing front garage fenestration. Installation of side facing windows at first floor. Extension to front elevation. Reconfiguration of roof form. Addition of dormers to main roof. Addition of Photovoltaic panels. 8. Stripping mortar from front elevation and repointing. Addition of garden studio (no sleeping accommodation). Replacement of existing windows. Installation of air source heat pump. Installation of air conditioning.

Reference
PA26/2837
Application date
14 Aug 2026
Full planning applicationAwaiting decision

16, Martindale, London, SW14 7AL

Demolition of existing rear conservatory and construction of a single storey side and rear infill extension. Extend and raise boundary parapet wall.

Reference
PA26/2750
Application date
7 Aug 2026
Approval of conditionsApproved

61A, Sheen Lane, London, SW14 8AB

Details pursuant to conditions 'U0155953 - Submitted Arboricultural Details' (Parts B - FULL DISCHARGE & C - PART DISCHARGE) and 'U0155954 - Tree Planting' (Part 1 - FULL DISCHARGE) of planning reference 23/0666/FUL.

Reference
PA26/2495
Application date
16 Jul 2026
Decision date
2 Sep 2026
Full planning applicationAwaiting decision

18, Holmesdale Avenue, London, SW14 7BQ

Ground floor rear extension and rear dormer loft extension to include the installation of 2no. Conservation Velux roof lights in the existing roof and 4no. Velux roof lights within the new rear extension pitched roof. With new aluminium sliding doors to the rear garden and associated internal refurbishment of the internal spaces.

Reference
PA26/2471
Application date
14 Jul 2026
Approval of conditionsAwaiting decision

424, Clifford House, Upper Richmond Road West, London, SW14 7JX

Details pursuant to conditions 7 - ecological enhancements, 10 - renewable energy, 11 - re-instatement of footpath and bin ramp - Grampian, 12 - boundary treatment, 13 - cycle parking, 14 - refuse arrangements, 17 - sustainable drainage evidence, 19 - digital connectivity, 20 - energy monitoring, 22 - internal noise limits, and 24 - details drainage design, of planning permission PA25/1503.

Reference
PA26/2044
Application date
11 Jun 2026
Full planning applicationApproved

252, Sheen Lane, London, SW14 8RL

Alterations to front garden including reconfiguration of existing driveway, replacement boundary treatment, associated landscaping and replacement tree planting.

Reference
PA26/1449
Application date
27 Apr 2026
Decision date
9 Sep 2026
Planning information from local councils and PlanIt. Area boundaries use ONS and Planning Data where available. Check the council record for the latest decisions and documents.
SAVED REPORTSave this reportKeep this exact planning view in My Places.
SAVE THIS REPORT

Keep this Place Keys report.

Enter your email and we’ll hold this exact report for you. You can then create a free account and it will move into My Places automatically.

We’ll use this email to save the report and send the link you asked for. This does not subscribe you to marketing. If you don’t create an account, the guest copy is automatically deleted after 30 days.

Watch this area

Check recent applications before setting up alerts. This prevents older applications being sent as new alerts.

Preparation uses a shared source check. Busy sources or larger areas may need the next scheduled collection. No alerts are enabled or emails sent by this step.