See applications in the area below, alongside planning rules and protections at your chosen location.
Within 0.62 miles of SW15 2QTApplication dates: 28 Sep 2025 to 28 Sep 2026Showing applications within 0.62 miles of this postcode.
153applications found0Types of mapped rules or protections found here, such as conservation areas, listed buildings or flood-risk zones. We count each type once, separately from applications. A zero means none were returned by our data sources; other restrictions may still apply.
SEARCH APPLICATIONS
Narrow your search
Search the selected area by proposal, reference, status, type, authority or date.
Please refer to the attached schedule of works. Only tree No 1 is within the TPO 63/1985 Works to tree No 1 is to Re-pollard back to previous pollard points
Demolition of existing building and erection of a new six-storey building to provide flexible community/commercial use (Class F.2/E) on part of the ground floor with the remainder of the ground floor and the upper floors providing a 50-bedroom hotel use (Class C1) with associated entrance/lobby, plant, refuse storage, cycle storage and landscaping.
Demolition of part of existing front wall to provide vehicle access; Alterations to hard and soft landscaping and formation of hardstanding to the front garden, to provide 1 x parking space in connection with formation of a vehicle crossover and dropped kerb.
Demolition of existing boundary wall and fence, and erection of a replacement front boundary boundary wall; Erection of cycle and refuse storage to the front garden.
T11 Cypress Reduce crown by 3m all round and shape. T12, T13 Poplar x2 Reduce / re-pollard to last points. T16 Cypress Row Reduce branches overhanging the garages only by approx. 2-3m. T25-T26 Robinia + Holly Cut back from building to create 2m clearance. T25 belongs to neighbour. Heavy leaning tree toward the building. We recommend this tree to be removed. G1 Tree branches Lift branches touching the small house roof to create 1.5m clearance.
Varation of condition 2 (in accordance with approved drawings) to planning permission dated 17/12/2025 ref 2025/3871 (Erection of a two-storey dwellinghouse in place of the existing garages at the rear of 23-24 Burstock Road with basement and associated lightwells) to allow enlargement of doors and alterations to fenestration, addition of canopy, intrnal rearrangement and extension of gable above flat roof.
Determination as to whether prior approval is required for change of use from commercial (class E) to residential (Class C3) and 2 x 1-bedroom flats and 2 x 2-bedroom flats.
Alterations including installation of three replacement double glazed timber bay basement windows to front; replacement of one rear window and rear double doors with aluminium units at basement level. Retention of an existing air-conditioning condenser and associated external service trunking at the rear.
Submission of details of a 1 metre square brick sample panel to be constructed on site for the inspection of the Council's Conservation Officer and approval in writing by the Local Planning Authority, pursuant to Condition 3 of listed building consent reference: 2025/03546/LBC dated 04 June 2026.
Alterations including erection of two storey rear extension; single storey rear extension; erection of rear roof extension to main roof and extension above existing two-storey back addtion including formation of third floor level rear roof terrace with 1.7m glazed safety screen surround.
Environmental Impact Assessment (EIA) Scoping Opinion in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) for the proposed redevelopment of approximately 1.89 hectares of land to provide four buildings comprising approximately 556 residential dwellings and 474 co-living units, together with approximately 4,813 sqm of non-residential floorspace including commercial and community uses. The proposals also include public open space, vehicular access and circulation routes, accessible car parking, works associated with the River Wandle.
Submission of details of a 1 metre square brick sample panel to be constructed on site for the inspection of the Council's Conservation Officer and approval in writing by the Local Planning Authority, pursuant to Condition 4; details of a condition survey of the adjoining public footpath/highway, pursuant to Condition 27 of planning permission reference: 2025/03545/FUL dated 04 June 2026.
Removal of the existing rear conservatory and erection of a single-storey rear extension, infilling of the existing side door and window opening; removal of the existing front patio; and replacement of the existing first-floor window.
Matters relating to Schedule 9 of the Section 106 Agreement attached to PP2024/4463 (Demolition of existing building and erection of a new six-storey building to provide flexible community/commercial use (Class F.2/E) on part of the ground floor with the remainder of the ground floor and the upper floors providing a 50-bedroom hotel use (Class C1) with associated entrance/lobby, plant, refuse storage, cycle storage and landscaping.).
Alteration including erection of rear extensions and front mansard roof extension to; existing ground floor commercial space, and in connection with change of use at upper floors to residential to create 4 x studio flats, 3 x 2 bedroom units.
4 no. Yew trees on the border with Whitelands Close. The trees are very overgrown and overhanging the neighbours in Whitelands Close Reduce height of each by 2m Cut back from building as touching buidings Lift each by 1.5m and remove any deadwood
Erection of mansard roof extension to main rear roof (with French doors and safety railings) and erection of an extension above two-storey back addition.
Page 1 of 7Next → Planning information from local councils and PlanIt. Area boundaries use ONS and Planning Data where available. Check the council record for the latest decisions and documents.
SAVED REPORTSave this reportKeep this exact planning view in My Places.
Watch this area
Check recent applications before setting up alerts. This prevents older applications being sent as new alerts.
Preparation uses a shared source check. Busy sources or larger areas may need the next scheduled collection. No alerts are enabled or emails sent by this step.
Checking your analytics preference.
Help improve Place KeysGoogle Analytics is on to help us understand how our public pages are used. You can turn it off at any time. About analytics & cookies