Battersea Power Station development site SW8 5BN
Variation of conditions 3 (Reserved Matters), 5 (Architectural Design Code), 6 (Placemaking Code), 7 (Parameter Plans), 8 (Land Uses), 10 (Distribution of Land Uses), 11 (Development Zone Land Uses), 13 (Maximum Residential units), 14 (Residential Mix), 18 (Phasing Plan), 20 (Car Parking), 21 (Residential Car Parking Spaces) and 61 (Approved Drawings) to outline planning permission dated 25th September 2020 (ref. 2020/0579) for: "the restoration, extension, alterations and conversion of the Power Station building to provide retail, residential flats, business, cultural, hotel and conference facilities, event space and incidental accommodation; the demolition of other buildings and development of the land surrounding the Power Station and adjacent/nearby sites to provide retail, restaurants bars and cafes, offices, hotel, residential, community and cultural space, assembly and leisure space, serviced apartments, an energy centre and basement plant; parking for cars, coaches, motorcycles and bicycles; new access and internal road system and servicing; 'off-site' highway works; works to the jetty and riverwall to facilitate river transport and fuel delivery; provision of open space and landscaping." The planning application is accompanied by an Environmental Statement Addendum
- Reference
- 2026/3243
- Application date
- 10 Sep 2026

