Flat 3, 82 New Cavendish Street, W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)
- Reference
- 26/07472/FULL
- Application date
- 5 November 2026
On this device · kept for 30 days
See what’s proposed, what’s changing and what’s been decided.
873 applications found.
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)
Installation of an external air condition condenser on the rear elevation within an enclosed courtyard.
Details of new service runs (Condition 6), internal wall insulation (Condition 11) and brick cleaning details (Condition 15) required by listed building consent (ref 2017/0415/L) dated 15/01/2018 for Various external and internal alterations and extension to the former Workhouse Building in association with the conversion of the building…
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)
Internal alterations associated with the retail fit-out of the ground floor and basement, including works to ceilings, columns, staircase, partitions, flooring and lighting, together with shopfront cleaning, replacement fascia lettering and installation of an externally illuminated projecting sign with bronze bracket. (Linked with 26/07334/ADV)
Display of a non-illuminated fascia sign measuring 0.28m x 1.94m and an externally illuminated projecting sign measuring 0.61m x 0.60m. (Linked with 26/07333/LBC)
Details of the methodology for repairs to the external render, stonework, ironwork and windows pursuant to Conditions 4 and 5 of listed building consent dated 17 September 2026 (RN: 26/04900/LBC).
Confirmation the demolition of the existing outrigger structure at fifth floor level (the Proposed Works) constitutes the lawful commencement of development pursuant to the Permission.
Installation of new public art sculptures and seating; hard and soft landscaping; installation of an area of raised terrace decking on St George Street measuring 43m x 2.6m for the placing of tables, chairs and banquette benches in connection with restaurant use; and associated external alterations and enabling…
Amendments to planning pemrission dated 10 October 2025 (RN: 25/01558/FULL) for the: Partial demolition, refurbishment and extension of the existing building to provide a sub-basement, basement, ground plus eight storey building; infilling and stepped rear extension; excavation of a new sub-basement level; installation of new plant equipment at…
Display of Christmas decorations to the front facade at ground floor level for a temporary period from 18 December 2026 to 9 January 2027.
Installation of glazed partitions and door sets to form meeting rooms on 2nd , 3rd and 4th floor offices.
Installation of three air conditioning condenser units to the lower ground floor rear courtyard, incluidng erection of a plunge pool. (retrospective)
Replacement of windows, Installation of an external condenser to the rear elevation including Internal refurbishment. (linked with 26/07452/LBC)
Registering address details for six flats and a Management office for 8 - 10 Hallam Street, London, W1W 6JE. Flat details as Flat1 -6 (cons) and office as Management Office , 8 - 10 Hallam Street, London, W1W 6JE.
Replacement of windows, Installation of an external condenser to the rear elevation including Internal refurbishment. (Linked with 26/07451/FULL)
Details of the replacement of the approved render finish to the rear extension with brickwork pursuant to Condition 3 of planning permission dated 08.06.2026 (RN: 26/01055/FULL).
Details of facing materials, biodiverse green roof details and management, and London Underground structures, ground movement, noise and vibration assessments pursuant to conditions 5, 9 and 10 pf planning permission dated 15 September 2026 (RN: 25/08482/FULL).
Details of each proposed sculpture by way of drawings, photographs and artists CV pursuant to condition 3 of planning permission dated 30.09.2025 (RN:25/05296/COFUL)
Installation of a conservatory (Retrospective)
Provision of internally illuminated temporary Christmas decoration to front facade at ground floor level between 18th December 2026 and 9th January 2027 (Linked to 26/07429/ADV)
Amalgamation of Flats 3 and 4 (Use Class C3) to form one single dwelling (Use Class C3) including associated internal reconfiguration and refurbishments, alterations to access arrangements and improvements to the existing terrace and private amenity spaces, new plant and other associated works. (Linked with 26/07416/LBC)
Amalgamation of Flats 3 and 4 to form one single dwelling including associated internal reconfiguration and refurbishments, alterations to access arrangements and improvements to the existing terrace and private amenity spaces. Together with the removal and alteration of modern partitions, roof replacement, rebuilding of the roof terrace, new…
Construction of balconies to the rear elevation at first, second, third and fourth-floor levels, and installation of doors in place of windows and use of the roof of the lower-ground-floor extension as terraces to serve six residential flats currently under construction.
Follow W1U 3JR for new applications. Keep your places together in My planning.
Within 0.62 miles of W1U 3JRPermission, permitted development and what happens next. Find your starting point.
Area guide