Pavement Fronting 2 - 6 Church Street St Helens WA10 1BD
Installation of 1no. black digital communications kiosk, defibrillator and ancillary advertisement.
- Reference
- P/2026/0515/FUL
- Application date
- 2 October 2026
On this device · kept for 30 days
See what’s proposed, what’s changing and what’s been decided.
23 applications found.
Installation of 1no. black digital communications kiosk, defibrillator and ancillary advertisement.
Digital advertising display integrated within digital communications kiosk.
Certificate of lawfulness for proposed change of use from dwellinghouse (Use Class C3) to a 6-person HMO (Use Class C4), including rear dormer, front rooflight and partial removal of chimney stacks.
Discharge of condition 9 (materials) and condition 10 (bird boxes) on approval P/2025/0579/FUL.
Discharge of condition 4 (material details), condition 5 (air conditioning) and condition 6 (bat and bird boxes) on approval of P/2026/0155/FUL.
Construction of new salt barn.
Installation of new front entrance doors to replace existing and the installation of a plant area and a fire exit door to the side.
Discharge condition 11 (construction method statement) on approval P/2025/0538/FUL.
Certificate of lawfulness for proposed change of use from Dwellinghouse (Use Class C3) to a 6-person HMO (Use Class C4), including rear dormer and front rooflight.
Discharge of condition 7 (local employment scheme) on approval P/2023/0544/FUL.
Discharge of Condition 14 on approval P/2023/0544/FUL.
Discharge conditions 8 (remediation), 19 (coal mining) and 20 (safe site) on application P/2025/0538/FUL.
Discharge conditions 3 (coal mining), 4 (safe site) and 5 (remediation) on application P/2025/0579/FUL.
Change of use at first floor level from commercial (E) to 1no flat (C3). New ground floor shop front door, and first floor window frame to match existing. Retention of ground floor commercial unit.
Partial discharge of condition 11 (remediation) on approval of P/2023/0246/FUL
Construction of 35no dwellings and associated landscaping and infrastructure.
Part discharge of Condition 11 (Remediation) on approval P/2023/0246/FUL.
Partial demolition of existing show room to create new external courtyard and external lights. Alterations to the building. Single storey side extension.
Re-instatement of partially demolished building along with single storey rear extension; Change of use of ground floor to funeral directors and the formation of 2no new flats at first and second floor level.
Partial discharge of condition 11 (remediation) on approval of P/2023/0246/FUL
Discharge condition 29 (road safety audits) and Partial discharge condition 21 (Landscape phasing plan) and condition 3 (public art) on approval of P/2023/0685/RES
Discharge of Conditions 13 (Habitat Management and Monitoring Plan) and 14 (Surface Water Drainage Scheme) on approval P/2025/0294/FUL.
Discharge of Condition 23 (Phase 2 Site Investigation and Risk Assessment Methodology ) on approval P/2025/0294/FUL
Follow WA9 5DT for new applications. Keep your places together in My planning.
Within 0.62 miles of WA9 5DTPermission, permitted development and what happens next. Find your starting point.
Area guide